Bridge Work May 22-23

 
Bridge work is scheduled to take place on the Highway 2 bridge in Peace River from May 22 to 23, 2026.
 
The work will involve seal coat application on the bridge. No full road closures are expected, but traffic will be managed one lane at a time while the work is underway.
 
Drivers should expect minor delays, reduced speeds, and temporary lane management through the work zone. Traffic control and signage will be in place to help guide motorists safely through the area.
 
Please slow down and use caution when travelling through the work zone.